
This is a photos show how the first floor addition looks and shows how they have removed the roof of the mud room to start the framing for the bedroom on the second floor.
You can see they have framed up the new windows in the back. There will be a lot of windows - we just ordered 38 of them. We are replacing every window in the house.
This is a good shot showing all the new windows that will be in the back. The existing windows on the far right will be replaced with french doors.
One nice thing is the entrance to the living room is much larger now. It really opens the first floor up.
Upstairs they have contiued to clear it out. Now it is basically just one large room. They will begin laying the walls back out in the next week or so once the remainder of the outside framing is done. They are really under the gun to get the rest of the outside framing done so they can close the house up from the weather. They are really focused on this before they do much more inside.
Wow the upstairs is a mess. You can see the stairwell at the lower right.
1 comment:
Very nice progress!
Best,
Jess
Post a Comment